Pearten

Monthly Portfolio Report

Kingsgate Quarter, Manchester · 214 homes · 4 amenity floors
Sample report · illustrative data
Reporting period
June 2026
Executive summary

Building activity rose 9% month-on-month, led by the co-working lounge and gym as summer scheduling settled. Energy intensity fell to 11.2 kWh/m², down 6% year-on-year, driven mostly by tighter plant-room scheduling on the two quiet amenity floors.

Comfort held well: 91% of amenity hours stayed inside the target temperature band, though the spa drifted warm on four evenings. One maintenance signal is worth acting on this month, and ESOS Phase 4 readiness is now on track ahead of the December qualification date.

Written automatically by Pearten from this building's live data. Reviewed before send.
This month at a glance
Avg. amenity occupancy
58%
▲ 9% vs May
Energy intensity
11.2
▼ 6% YoY · kWh/m²
Hours in comfort band
91%
– 1pt vs May
Compliance readiness
82%
▲ 7pt · ESOS P4

Amenity occupancy

Average peak-hour utilisation, June
Gym
78%
Co-working
71%
Lounge
64%
Roof terrace
55%
Spa
42%
Cinema
38%

Energy through the month

Daily consumption, kWh (whole building)
900 700 500 1 Jun 30 Jun
Daily kWhMonth low, 28 Jun
Compliance readiness

On track for the deadlines that matter

ESOS Phase 4: data readiness82% · on track
Qualification 31 Dec 2026. Twelve months of clean monitoring data will be in place by Q4.
MEES: EPC C targetB/C mixed · action by 2028
3 of 4 amenity zones at EPC C or better. Roof-terrace plant is the outstanding item ahead of April 2028.
Recommended actions: decisions, not dashboards
01

Re-time spa HVAC to a 21:00 setback

The spa held 2–3°C above target on four evenings after the last booking. A 21:00 setback recovers comfort and trims the building's single largest evening load.

Est. impact · ~4% monthly energy · comfort restored
02

Investigate cinema AHU short-cycling

The cinema air-handling unit cycled 40% more than its floor peers despite the lowest occupancy. Likely a sensor or schedule fault worth a contractor look before it becomes a call-out.

Est. impact · avoid one reactive call-out
03

Promote off-peak co-working capacity

Co-working ran near capacity 08:00–11:00 but sat under 30% after 15:00. A resident nudge toward the afternoon slot smooths demand without new space.

Est. impact · higher amenity satisfaction, no capex
© 2026 Pearten Ltd · Generated for Kingsgate Quarter · Sample